syntax:functions:workdays
This is an old revision of the document!
Table of Contents
Workdays(from_date, to_date, [exclude],[include],[weekend_start])
Category: Date and Time function
Description
This function returns the number of workdays (i.e. all days except the two weekend days, which are Saturday and Sunday unless weekend_start says otherwise) between from_date and to_date. Both date boundaries are inclusive.
Arguments
| Argument | Type | Description |
|---|---|---|
| from_date | Date or Number (date serial) | An expression representing the first date value to derive the number of workdays from. |
| to_date | Date or Number (date serial) | An expression representing the second date value to derive the number of workdays from. |
| exclude | Text | (Optional) Dates to exclude from the calculation. This argument should appear as a list of comma-separated dates in text format, enclosed in quotes (i.e., "2020-11-26, 2020-04-24"). |
| include | Text | (Optional) Dates to include in the calculation. This argument should appear as a list of comma-separated dates in text format, enclosed in quotes (i.e., "2020-08-15, 2020-03-22"). |
| weekend_start | Number | (Optional) The day of the week the two weekend days start on, from 1 (Sunday) to 7 (Saturday), the same numbering as Weekday(). The default is 7, i.e. the weekend is Saturday and Sunday. |
Return value type: Number
Remarks
The from_date and to_date arguments can take any value or expression that evaluates to a date serial value. Examples include:
- A date literal: #2019-12-12
- A date serial value: 43811 (the date serial for "2019-12-12")
- A date value created using any of the Date/Time functions that returns a date serial value.
The exclude and include arguments need to be a date or list of dates, delimited by commas, enclosed in quotes, and appearing in yyyy-MM-dd format:
- A single date: "2024-02-20"
- List of 3 dates: "2023-04-01, 2023-07-22, 2023-10-31"
- Use empty quotes ("") in the exclude position if no dates will be excluded, but there are dates to be included.
- Use empty quotes in both positions to specify weekend_start without excluding or including any dates.
- A date serial value cannot be used (i.e., "43811").
Examples
workdays(#2020-05-01,#2020-05-20) //Returns 14
workdays(#2019-01-01,#2019-12-31) //Returns 261 (The number of workdays in a non-leap-year year.)
workdays(#2005-12-17, #2005-12-18) //Returns 0 (The 17th is a Sat and the 18th is a Sun.)
workdays(#2005-12-17, #2005-12-18, "", "", 6) //Returns 1 (The weekend is Fri and Sat, so the 18th is a workday.)
workdays(#2019-01-01,#2019-12-31,"2019-07-13","2019-07-26") //Returns 261 (1 exclusion, 1 inclusion.)
workdays(#2019-01-01,#2019-12-31,"2019-05-24,2019-06-28") //Returns 259 (2 exclusions.)
workdays(#2019-01-01,#2019-12-31,"","2019-06-29") //Returns 262. (No exclusions, one inclusion.)
See also
syntax/functions/workdays.1791874531.txt.gz · Last modified: by roberto